Curious about using drones on your worksite?
Start here

The Real Cost of Inaccurate Construction and Earthworks Data

| 11.10.2021

Data is everywhere. Thanks to advanced sensors, drones, artificial intelligence (AI), and the Internet of Things (IoT), we’ve never had more information at our fingertips. A recent report from Autodesk and FMI reveals that the volume of available project data has doubled in the past 3 years—a massive increase from the largely manual methods of the past.

But access to all that information comes at a cost. First, there’s overwhelm—after all, even the best data is only as good as your ability to use it. Then, there’s accuracy. All data is not created equal, and inaccurate data is one of the leading contributors to a well of “bad” project info.

80% of contractors believe that at least 20% (and often far more) of their data is bad, meaning that most firms aren’t making full use of their data because they can’t trust it.

earthworks on a construction site

From material waste and schedule overruns to legal disputes, inaccurate worksite data carries high stakes. Usable, high-accuracy data isn’t just nice to have anymore; it’s essential, especially when it comes to winning bids and outperforming competitors. 

Here’s why earthworks data that’s simply “good enough” never actually is.

Financial impact

The construction industry lost $1.8 trillion globally as a result of bad data in 2020 alone. Inaccurate and unreliable data was to blame for 14% of all avoidable rework, and a full one-third of bad decisions onsite were made as a result of bad data.

In other words, to a considerable degree, your revenue is determined by the accuracy of your construction and earthworks data.

The financial repercussions of bad data can come in many forms:

  • Rework (including time, labor and materials)
  • Legal disputes
  • Penalties for project delays
  • Fines imposed for worksite mistakes

Working with highly accurate data means completing projects correctly the first time, avoiding penalties, and increasing your odds of finishing a project on time and on budget—not to mention getting paid promptly.

Propeller eliminates inaccurate construction and earthworks data with advanced drone data analytics and 3D mapping that is highly accurate
Say goodbye to inaccurate construction and earthworks data with Propeller

Project delays and labor cost

Fewer than 30% of contractors finish projects on time and on budget. That’s not just a common perception—it’s backed by fact. Most contractors spend a quarter of their working hours waiting for other work to be finished.

When equipment and teams aren’t in the right place, or have to wait for other work to finish as a result of poor worksite communication or management, things get expensive, fast.

And here’s the catch. Most project delays are preventable—assuming you can leverage the right data. Think about how important site coordination is to a project. If project managers have access to data that’s outdated, overly complicated, or just plain wrong, site coordination won’t go as well as it could.

Now, imagine a worksite with data that’s always highly accurate, up-to-date, and easy to use. Suddenly, you’ve got a site that’s humming along—or, at worst, a team that’s prepared to respond quickly when unforeseeable issues do arise.

Customer dissatisfaction 

When your site data isn’t accurate, customers lose confidence in your abilities—and that’s the best case scenario. As one construction management consultant put it, “Contractors are only as good as their last mistake.”

Customer satisfaction is incredibly important in construction. It bolsters your reputation and increases the odds of getting bigger and better contracts down the line. But bad data leads to worksite mistakes and delays, which create dissatisfied customers at best and legal disputes at worst.

The legal implications of failing to survey a site properly and record accurate topographic data can be downright scary. They can make or break small firms, and cost large firms thousands or millions of dollars, depending on severity. In North America, the average length of a construction dispute was nearly 18 months, with an average value of $18.8 million in 2019.

Luckily, it’s not all doom and gloom. Request a demo today to learn how Propeller can boost your construction and earthworks data accuracy to keep your clients (and your bottom line) happy for years to come.

Subscribe to our newsletter
We’ll let you know every time we publish something new
Say hello to the Propeller Platform
Track, map, and measure active sites anywhere, anytime using cloud-based 3D surveys. Invite your whole team to join and collaborate from a one source of truth.
Get A Demo